แบนเนอร์
บ้าน

ห้องทดสอบอุณหภูมิ

ห้องทดสอบอุณหภูมิ

  • Selection of the installation site of the rapid temperature change test chambe Selection of the installation site of the rapid temperature change test chambe
    Jun 27, 2025
    Selection of the installation site of the rapid temperature change test chamber: The distance from the adjacent wall can smoothly give full play to the role and characteristics of the environmental test chamber. The long-term temperature of 15 ~ 45 °C and the relative environmental humidity exceeding 86% should be selected. site. The working temperature of the installation site must not change significantly.  It should be installed on a leveling surface (use a level to determine the level on the road during installation). It should be installed in a site without sun exposure.  It should be installed in a site with excellent natural ventilation. It should be installed in areas where flammable materials, explosive products and high-temperature heat sources are eliminated. It should be installed in a site with less dust. Install it as close as possible to the switching power supply of the power supply system.
    อ่านเพิ่มเติม
  • What should I do if the high and low temperature test chamber has problems? What should I do if the high and low temperature test chamber has problems?
    Jun 23, 2025
    High and low temperature test chamber may encounter a variety of problems in the process of use, the following is a summary of potential faults and their causes from different perspectives: 1. Core system failure Temperature out of control Reason: PID control parameters are out of balance, ambient temperature exceeds the design range of the equipment, multi-zone temperature interference. Case: In a special environment workshop, the external high temperature causes the refrigeration system to overload, resulting in temperature drift. Humidity is abnormal Reason: poor water quality of humidification leads to scaling and nozzle blockage, failure of ultrasonic humidifier piezoelectric sheet, and incomplete regeneration of dehumidification desiccant. Special phenomenon: reverse condensation occurs during high humidity test, resulting in the actual humidity in the box being lower than the set value. 2. Mechanical and structural problems Air flow is disorganized Performance: There is a temperature gradient of more than 3℃ in the sample area. Root cause: the customized sample rack changed the original design air duct and the accumulation of dirt on the centrifugal fan blade led to the destruction of dynamic balance.  sealing failure New failure: the magnetic force of electromagnetic sealing door decreases at low temperature, and the silicone sealing strip becomes brittle and cracks after-70℃. 3. Electrical and control system Intelligent control failure Software level: After firmware upgrade, the temperature dead zone setting error occurs and the historical data overflow causes the program to crash. Hardware level: SSR solid state relay breakdown causes continuous heating and bus communication is subjected to inverter electromagnetic interference. Security protection vulnerabilities Hidden dangers: the synchronous failure of the triple temperature protection relay and the false alarm caused by the expiration of the refrigerant detector calibration. 4. Challenges of special working conditions Specific temperature shock Problem: -40℃ to +150℃ rapid conversion of the evaporator weld stress cracking, thermal expansion coefficient difference resulting in the failure of the observation window seal. Long-term operation attenuation Performance degradation: after 2000 hours of continuous operation, the compressor valve plate wear leads to a decrease of 15% in refrigeration capacity and drift of ceramic heating tube resistance value. 5. Environmental and maintenance impact Infrastructure adaptation Case: The power oscillation of PTC heater caused by the fluctuation of power supply voltage and the water hammer effect of cooling water system damaged the plate heat exchanger. Preventive maintenance blind spots Lesson: Ignoring the positive pressure of the box leads to water entering the bearing chamber and biofilm growth and blockage in the condensate discharge pipe. 6. Pain points of emerging technologies New refrigerant application Challenges: system oil compatibility problems after R448A replaces R404A, and high pressure sealing problems of subcritical CO₂ refrigeration systems. IoT integration risks Fault: The remote control protocol is maliciously attacked, resulting in program tampering and cloud storage failure, resulting in the loss of test evidence chain. Strategy recommendations Intelligent diagnosis: configure vibration analyzer to predict the failure of compressor bearing, and use infrared thermal imager to scan the electrical connection points regularly. Reliability design: key components such as evaporator are made of SUS316L stainless steel to improve corrosion resistance, and redundant temperature control modules are added to the control system. Maintenance innovation: implement a dynamic maintenance plan based on operating hours, and establish an annual refrigerant purity testing system。 The solutions to these problems need to be analyzed in combination with the specific model of the equipment, the use environment and the maintenance history. It is recommended to establish a collaborative maintenance mechanism including the OEM of the equipment, third-party testing institutions and user technical teams. For key test items, it is recommended to configure a dual-machine hot standby system to ensure the continuity of testing.  
    อ่านเพิ่มเติม
  • What are the delivery standards of Guangdong Hongzhan? What are the delivery standards of Guangdong Hongzhan?
    Jun 23, 2025
    (1) Equipment installation and commissioning On-site service: technical personnel will deliver the goods free of charge and complete the mechanical assembly, electrical wiring and debugging. The debugging parameters shall meet the temperature and humidity, salt spray deposition amount and other indicators in the customer's technical agreement. Acceptance criteria: provide a third-party measurement report, and unqualified equipment shall be returned or replaced directly. For example, the rain test box shall pass 100% acceptance. (2) Customer training system Operation training: covers equipment start and stop, program setting and daily maintenance, customized for different user scenarios such as quality inspection institutions and automobile enterprises. Deep maintenance training: including fault diagnosis (such as troubleshooting of humidity system in high and low temperature and humidity test chamber) and spare parts replacement to improve customers' independent maintenance ability. (3) Technical support and response Instant response: respond to repair demand within 15 minutes, and solve routine faults within 48 hours (negotiate with remote areas). Remote diagnosis: through video guidance or remote access software, quickly locate the problem (such as abnormal dust concentration in the sand test chamber). (4) Spare parts supply and maintenance Make spare parts plan, give priority to the supply of wear and tear parts from cooperative units (such as China Railway Inspection and Certification Center, China Electronics Technology Group), and reduce downtime. Non-manual damage is free of charge during the warranty period, and paid services are provided after the warranty period with transparent charges.
    อ่านเพิ่มเติม
  • What should be paid attention to in summer when using the ice water impact test chamber? What should be paid attention to in summer when using the ice water impact test chamber?
    Jun 16, 2025
      When the Guangdong Hongzhan ice water impact test chamber is used in summer, the following matters should be paid special attention to to ensure the stable operation of the equipment and the accuracy of the test results: 1. Environment and heat dissipation management   Enhance ventilation and heat dissipation High temperature in summer is easy to lead to the decrease of equipment heat dissipation efficiency. Ensure that at least 10cm space is reserved around the equipment to promote air circulation. If the equipment adopts air cooling system, the condenser surface dust should be cleaned regularly to prevent poor heat dissipation and overheating of the compressor.Control the environmental temperature and humidity. Avoid placing the equipment in the direct sunlight area. It is recommended that the laboratory temperature be kept at 25±5℃ and the humidity be lower than 85%. High temperature and high humidity environment may accelerate the accumulation of frost or condensation water on the equipment, so it is necessary to increase the dehumidification measures. 2. Refrigeration system maintenance   Water quality and tank management Bacteria are easy to breed in summer, so use deionized water or pure water to avoid hard water scaling and blocking pipes. It is recommended to change the tank water every 3 days, and empty and clean the tank before long-term disuse.Refrigeration efficiency monitoring High temperature environment may lead to overload operation of the refrigeration system. The compressor oil condition should be checked regularly to ensure sufficient refrigerant. If the water temperature exceeds the set value (such as 0~4℃), the machine should be stopped immediately for troubleshooting. 3. Frosting and defrosting treatment   Prevent frost aggravation When the humidity is high in summer, the frost rate inside the equipment may accelerate. It is recommended to perform a manual defrosting process after 10 cycles: set the temperature to 30℃ and keep it for 30 minutes, and then drain water to clean the ice crystals on the evaporator surface. Optimize the test interval to avoid continuous long-term low temperature testing. It is recommended to reserve 15 minutes of buffer time between high temperature (e.g., 160℃) and ice water shock cycle to reduce the impact of thermal stress on the equipment. 4. Adjustment of operation specifications   Parameter setting optimization According to the characteristics of the summer environment, the normal temperature recovery stage time can be shortened appropriately (the reference standard is to complete the temperature switch within 20 seconds), but it must ensure that it meets the requirements of GB/T 2423.1 or ISO16750-4 standards.Safety protection should be strengthened. Anti-freezing gloves and goggles should be worn during operation to avoid the adhesion of hands and low-temperature parts caused by sweating. Before opening the door after high temperature test, the temperature inside the box should be confirmed to be below 50℃ to prevent scalding from hot steam. 5. Emergency and long-term shutdown preparation   Fault response If the equipment has E01 (temperature out of tolerance) or E02 (water level abnormal) alarm, you should immediately cut off the power supply and contact the technical support of the manufacturer. Do not disassemble the refrigeration pipeline by yourself.Long-term protection When not used for more than 7 days, the water tank should be emptied, power should be cut off and dust cover should be covered. At the same time, power should be on for 1 hour every half a month to keep the circuit board dry.   Through the above measures, the impact of high temperature and humidity environment in summer on the ice water shock test chamber can be effectively reduced to ensure the reliability of test data and the service life of the equipment. The specific operation details should be adjusted according to the equipment manual and actual working conditions.
    อ่านเพิ่มเติม
  • Maintenance methods for constant temperature and humidity test chambers Maintenance methods for constant temperature and humidity test chambers
    Jun 13, 2025
    1. Dust adhering to the condenser can cause the high-pressure switch of the compressor to trip and issue false alarms. Therefore, dust attached to the cooling grid of the condenser can be removed with a vacuum cleaner every month, or by using a hard-bristled brush after turning on the machine, or by blowing it off with a high-pressure air nozzle.2. The area around the machine and the ground at the bottom should be kept clean at all times to prevent a large amount of dust from being sucked into the unit or reducing equipment performance and causing accidents.3. When opening or closing the door or taking samples from the test chamber, do not touch the sealing strip on the door.4. The core of the constant temperature and humidity test chamber - the refrigeration system should be inspected once a year. Check for leaks in the copper tubes and at each joint and interface. If there are any, inform the manufacturer.5. The humidifier and water tank should be cleaned frequently to avoid scaling and affecting steam emission. Clean them after each test. Timely descaling helps extend the lifespan of the humidification tube and ensures smooth water flow. When cleaning, use a copper brush and then rinse with water.6. The distribution room should be cleaned and inspected more than once a year. Loose nodes can put the entire equipment in a dangerous working state, burn out components, cause fires, alarms, and endanger lives.7. The dry and wet bulb wicks should be checked frequently. Replace them promptly if they become hard or dirty. It is recommended to replace them every three months.8. Inspection and maintenance of the water circuit. The water pipes in the water circuit are prone to clogging and leakage. Regularly check for leaks or blockages. If found, remove them promptly or notify the manufacturer.
    อ่านเพิ่มเติม
  • 2 เหตุผลที่ห้องทดสอบอุณหภูมิและความชื้นคงที่ไม่ทำความเย็น 2 เหตุผลที่ห้องทดสอบอุณหภูมิและความชื้นคงที่ไม่ทำความเย็น
    Jun 10, 2025
    เหตุผลหนึ่ง 1. เนื่องจากอุณหภูมิของห้องทดสอบอุณหภูมิและความชื้นคงที่ไม่สามารถรักษาไว้ได้ ให้สังเกตว่าคอมเพรสเซอร์ทำความเย็นสามารถเริ่มทำงานได้หรือไม่เมื่อห้องทดสอบกำลังทำงาน และคอมเพรสเซอร์สามารถเริ่มทำงานได้หรือไม่เมื่ออุปกรณ์ทดสอบสภาพแวดล้อมกำลังทำงาน โดยระบุว่าวงจรจากแหล่งจ่ายไฟหลักไปยังคอมเพรสเซอร์แต่ละตัวเป็นปกติและระบบไฟฟ้าไม่มีปัญหา2. ระบบไฟฟ้าไม่มีความผิดปกติ ให้ตรวจสอบระบบทำความเย็นต่อไป ก่อนอื่น ให้ตรวจสอบว่าแรงดันไอเสียและแรงดันดูดของคอมเพรสเซอร์อุณหภูมิต่ำ (R23) ของชุดทำความเย็นทั้งสองชุดต่ำกว่าค่าปกติหรือไม่ และแรงดันดูดอยู่ในสถานะสุญญากาศหรือไม่ ซึ่งบ่งชี้ว่าปริมาณการทำความเย็นของชุดทำความเย็นหลักไม่เพียงพอ3. แตะท่อไอเสียและท่อดูดของคอมเพรสเซอร์ R23 ด้วยมือ พบว่าอุณหภูมิของท่อไอเสียไม่สูง และอุณหภูมิของท่อดูดก็ไม่ต่ำ (ไม่มีน้ำแข็งเกาะ) ซึ่งยังบ่งบอกว่าสารทำความเย็น R23 ในเครื่องโฮสต์ไม่เพียงพออีกด้วยเหตุผลอื่น: 1. สาเหตุของความล้มเหลวยังไม่ได้รับการระบุ และต้องมีการยืนยันเพิ่มเติมร่วมกับกระบวนการควบคุมของห้องทดสอบอุณหภูมิและความชื้นคงที่ ห้องทดสอบมีชุดทำความเย็นสองชุดหน่วยหนึ่งคือหน่วยหลัก และอีกหน่วยหนึ่งคือหน่วยเสริม เมื่ออัตราการทำความเย็นสูง หน่วยทั้งสองจะทำงานพร้อมกันในช่วงเริ่มต้นของเฟสการรักษาอุณหภูมิ เมื่ออุณหภูมิคงที่ หน่วยเสริมจะหยุด และหน่วยหลักจะรักษาอุณหภูมิ หากสารทำความเย็น R23 รั่วออกจากหน่วยหลัก ประสิทธิภาพการทำความเย็นจะลดลงอย่างมาก ในระหว่างกระบวนการทำความเย็น หน่วยทั้งสองจะทำงานพร้อมกัน ทำให้อุณหภูมิคงที่และอัตราการทำความเย็นลดลงอย่างค่อยเป็นค่อยไป ในระยะฉนวน หากหน่วยเสริมหยุดทำงาน หน่วยหลักจะสูญเสียฟังก์ชันการทำความเย็น ทำให้ปริมาณอากาศภายในห้องทดสอบเพิ่มขึ้นช้าๆ เมื่ออุณหภูมิถึงระดับหนึ่ง ระบบควบคุมจะเปิดใช้งานหน่วยเสริมเพื่อให้เย็นลง หลังจากนั้น หน่วยเสริมจะหยุดอีกครั้ง สาเหตุของความล้มเหลวในการผลิตได้รับการระบุว่าเกิดจากสารทำความเย็นอุณหภูมิต่ำ (R23) รั่วออกจากหน่วยหลัก เมื่อตรวจสอบระบบทำความเย็นเพื่อหาจุดรั่ว พบรอยแตกร้าวที่ก้านวาล์วของโซลินอยด์วาล์วบายพาสก๊าซร้อน ซึ่งมีความยาวประมาณ 1 ซม. หลังจากเปลี่ยนโซลินอยด์วาล์วและเติมสารทำความเย็นใหม่ ระบบก็กลับมาทำงานได้ตามปกติ การวิเคราะห์นี้แสดงให้เห็นว่าการวินิจฉัยข้อบกพร่องนั้นใช้แนวทางแบบทีละขั้นตอน โดยเริ่มจากแง่มุม "ภายนอก" แล้วค่อยไปด้านใน จากนั้นจึงเน้นที่ "ไฟฟ้า" และสุดท้ายที่ "การทำความเย็น" ความเข้าใจอย่างถ่องแท้เกี่ยวกับหลักการและกระบวนการทำงานในห้องทดสอบถือเป็นสิ่งสำคัญสำหรับการวินิจฉัยข้อบกพร่องอย่างแม่นยำ
    อ่านเพิ่มเติม
  • เงื่อนไขการใช้งานห้องทดสอบอุณหภูมิสูงและต่ำและความดันต่ำ
    Feb 26, 2025
    เงื่อนไขที่หนึ่ง: เงื่อนไขด้านสิ่งแวดล้อม1. อุณหภูมิ: 15 ℃~35 ℃;2. ความชื้นสัมพัทธ์ : ไม่เกิน 85%;3. ความดันบรรยากาศ: 80kPa~106kPa4. ไม่มีแรงสั่นสะเทือนรุนแรงหรือก๊าซกัดกร่อนอยู่รอบๆ5. งดการสัมผัสแสงแดดโดยตรงหรือรังสีโดยตรงจากแหล่งความเย็นหรือความร้อนอื่นๆ6. ไม่มีการไหลเวียนของอากาศที่รุนแรงรอบๆ และเมื่อจำเป็นต้องบังคับให้อากาศโดยรอบไหลออกมา ไม่ควรเป่าลมไปที่อุปกรณ์โดยตรง7.ไม่มีสนามแม่เหล็กรอบ ๆ ห้องทดสอบ ซึ่งอาจไปรบกวนวงจรควบคุมได้8.ไม่มีฝุ่นละอองและสารกัดกร่อนสะสมในปริมาณสูงในบริเวณรอบๆ เงื่อนไขที่ 2: สภาพแหล่งจ่ายไฟ1. แรงดันไฟฟ้ากระแสสลับ: 220V ± 22V หรือ 380V ± 38V;2. ความถี่: 50Hz ± 0.5Hz.  เงื่อนไขการใช้งาน 3 : เงื่อนไขการจ่ายน้ำแนะนำให้ใช้น้ำประปาหรือน้ำหมุนเวียนที่เป็นไปตามเงื่อนไขต่อไปนี้: 1.อุณหภูมิของน้ำ: ไม่เกิน 30℃; 2.แรงดันน้ำ: 0.1MPa ถึง 0.3MPa; 3.คุณภาพน้ำ : เป็นไปตามมาตรฐานน้ำอุตสาหกรรม  เงื่อนไขการใช้งานที่สี่: โหลดสำหรับห้องทดสอบ โหลดห้องทดสอบจะต้องตรงตามเงื่อนไขต่อไปนี้พร้อมกัน: 1. มวลรวมของภาระ: มวลของภาระต่อปริมาตรพื้นที่ทำงานลูกบาศก์เมตรไม่ควรเกิน 80 กก. 2. ปริมาตรรวมของภาระ: ปริมาตรรวมของภาระไม่ควรเกิน 1/5 ของปริมาตรพื้นที่ทำงาน 3. การวางโหลด: ในพื้นที่หน้าตัดใดๆ ที่ตั้งฉากกับทิศทางการไหลของอากาศหลัก พื้นที่รวมของโหลดไม่ควรเกิน 1/3 ของพื้นที่หน้าตัดของพื้นที่ทำงาน โหลดจะต้องไม่กีดขวางการไหลของอากาศ  
    อ่านเพิ่มเติม

ฝากข้อความ

ฝากข้อความ
หากคุณสนใจผลิตภัณฑ์ของเราและต้องการทราบรายละเอียดเพิ่มเติม โปรดฝากข้อความไว้ที่นี่ เราจะตอบกลับคุณโดยเร็วที่สุด
ส่ง

บ้าน

สินค้า

วอทส์แอพพ์

ติดต่อเรา